• AWWA ACE91025
Provide PDF Format

Learn More

AWWA ACE91025

  • Full Scale Application of Direct Filtration to San Francisco Bay- Delta Water
  • Conference Proceeding by American Water Works Association, 01/01/1991
  • Publisher: AWWA

$12.00$24.00


The challenge of full-scale implementation is to duplicate or exceed results obtained at the demonstration scale. In addition to upscaling process selection, obstacles are materials and equipment selection and application, site and structural configuration and optimization, regulatory uncertainty, and budget constraints and scheduling. A successful case study, the Randall-Bold Water Treatment Plant in Concord, California, is used to address these issues. The plant was constructed jointly by the Contra Costa Water District and the Oakley Water District. Terms of the CCWD-OWD agreement are given. A detailed discussion of the upscaling process is given, involving grit removal, pre-ozonation, flash mix, flocculation, filtration, final disinfection, and start-stop operation. A variety of features were incorporated into the plant design to accommodate conditions requiring a special approach, or as capital and O&M cost saving features. One of the most cost-effective techniques was a consistent design for similar elements of the plant. Details are given on plant features, including consistent design, ozonation, pumped diffusion flash mix, hydraulic flocculation, deep-bed GAC-Sand filters, distributed control system- SCADA, and toxics containment and control.

Related Products

AWWA ACE93188

AWWA ACE93188

Behavior of Bromine-Substituted THMs and HAAs During Ozonation and Biodegradation..

$12.00 $24.00

AWWA JTMGT69649

AWWA JTMGT69649

Planning for Sustainable Water Resources..

$12.00 $24.00

AWWA ACE90052

AWWA ACE90052

Maintaining State Primacy: The Burden, The Strength, The Challenge..

$12.00 $24.00

AWWA MTC61136

AWWA MTC61136

Eight Years and Two Billion Gallons Later: An Update On a Triple Membrane Plant..

$12.00 $24.00