• AWWA ACE91146
Provide PDF Format

Learn More

AWWA ACE91146

  • Using Production Costing to Evaluate Conservation Projects or Alternative Supplies
  • Conference Proceeding by American Water Works Association, 01/01/1991
  • Publisher: AWWA

$12.00$24.00


This paper introduces production costing and illustrates how it can be used in the evaluation of water conservation projects or alternative supplies. Production cost models are useful tools to evaluate supply- and demand-side alternatives. The model calculates the costs incurred in producing a water supply to meet forecasted loads. Comparisons between conventional and alternative resources can be completed with the aid of a production cost model tailored to a utility's unique situation. Finally, the use of a production cost model for scenario planning helps to address uncertainty about the future. Comparisons of production costing results for the scenarios are valuable in the creation of robust water utility plans. This paper covers a description of the planning process for production costing, a detailed outline of what a production cost model contains, and a simplified example that demonstrates how a production cost model can be used. A number of tables show a seven-year simplified production costing model under various conditions.

Related Products

AWWA ACE94269

AWWA ACE94269

A New Tool for the Study of the Evolution of Water Quality in Distribution Systems: Design of a Net..

$12.00 $24.00

AWWA JAW56926

AWWA JAW56926

Journal AWWA - Tailored Rates..

$15.00 $30.00

AWWA WQTC63961

AWWA WQTC63961

Effectiveness of Control Measures on Trihalomethanes and Haloacetic Acids in Drinking Water for 1997..

$12.00 $24.00

AWWA ACE93193

AWWA ACE93193

Putting Together the Pieces: Optimizing Corrosion Control in Philadelphia..

$12.00 $24.00