• AWWA ACE91157
Provide PDF Format

Learn More

AWWA ACE91157

  • The Decision-Making Process in Designing an Ozonation Facility for a Large Water Treatment Plant
  • Conference Proceeding by American Water Works Association, 01/01/1991
  • Publisher: AWWA

$12.00$24.00


The purpose of this paper is to show the decision-making process or steps involved in the design of an ozone facility for the expansion of the Alvarado Water Treatment Plant in the City of San Diego, California. Specific steps outlined are: treatment objectives; process design criteria; plant flow projections; location and number of contactors; gas dissolution system; contactor volume; contactor design and operation; ozone generator sizing; ozoner generator alternatives; and reilability of disinfection.

Related Products

AWWA SOURCES66408

AWWA SOURCES66408

Market Research Study: Barriers and Opportunities to Sustainable Landscaping Practices in the Reside..

$12.00 $24.00

AWWA 51488

AWWA 51488

Piloting New Work Practices in Utility Maintenance..

$12.00 $24.00

AWWA JTMGT57479

AWWA JTMGT57479

Fair Impact Fees for Large Non-Residential Users..

$12.00 $24.00

AWWA JAW3798

AWWA JAW3798

Journal AWWA - Evaluating the Effects of Earthquakes on Buried Pipelines ..

$15.00 $30.00