• AWWA ACE91174
Provide PDF Format

Learn More

AWWA ACE91174

  • Incorporating Pre-Engineered Facilities Into a Custom Design Process
  • Conference Proceeding by American Water Works Association, 01/01/1991
  • Publisher: AWWA

$12.00$24.00


Incorporating a pre-engineered component or module into a treatment system offers the owner a number of significant advantages over a totally custom design option. In addition to representing a lower capital cost, a qualified manufacturer offers an expertise representative of a broad project base, the benefits of which can be applied to the facility under design. Enhanced design features and details are available as a result of manufacturers' research and development programs. Quality control, an important aspect to insuring that the completed facility meets design requirements, is typically far superior on a shop-fabricated component than the methodology employed to monitor construction operations at the job site. Offsetting these advantages, are inherent characteristics associated with pre- engineered components. A case study of the Manasquan Water Treatment Plant, including background, design approach, and implementation is given.

Related Products

AWWA JAW22919

AWWA JAW22919

Journal AWWA - Bench-Scale Evaluation of Coagulants for Low Turbidity Water ..

$15.00 $30.00

AWWA REUSE52132

AWWA REUSE52132

A Major Texas Potable Water Supply Reclaimed Water Augmentation Project..

$12.00 $24.00

AWWA INF52177

AWWA INF52177

Ozone Feasibility Study: Dalecarlia and McMillan Water Treatment Plants..

$12.00 $24.00

AWWA WQTC65812

AWWA WQTC65812

Occurrence and Control of Naegleria Fowleri in Well Water Chlorine Resistance..

$12.00 $24.00