• AWWA ACE91214
Provide PDF Format

Learn More

AWWA ACE91214

  • Maintenance of Service and Customer Relations
  • Conference Proceeding by American Water Works Association, 01/01/1991
  • Publisher: AWWA

$12.00$24.00


Once a determination has been made to rehabilitate an existing water main, your next thoughts must be centered on supplying continuous domestic service and fire protection. In some instances, but very few, shutdown of water mains for very short periods on a daily basis can be tolerated while work is being carried out. Under normal conditions cleaning and lining projects are almost certain to require extensive shutdowns, thereby necessitating the need for bypass piping.

Related Products

AWWA JAW22919

AWWA JAW22919

Journal AWWA - Bench-Scale Evaluation of Coagulants for Low Turbidity Water ..

$15.00 $30.00

AWWA REUSE52132

AWWA REUSE52132

A Major Texas Potable Water Supply Reclaimed Water Augmentation Project..

$12.00 $24.00

AWWA INF52177

AWWA INF52177

Ozone Feasibility Study: Dalecarlia and McMillan Water Treatment Plants..

$12.00 $24.00

AWWA WQTC65812

AWWA WQTC65812

Occurrence and Control of Naegleria Fowleri in Well Water Chlorine Resistance..

$12.00 $24.00