Provide PDF Format
AWWA ACE91225
- Planning a Treated Water System for the New Denver International Airport
- Conference Proceeding by American Water Works Association, 01/01/1991
- Publisher: AWWA
$12.00$24.00
Planning treated water facilities for the new Denver International Airport has been influenced by several factors. Presented is a discussion of some of the more significant factors: method and area of service; demand estimates (land use, demand, fire flow requirements, conservation, irrigation); engineering standards; (pressure standards, looping standard, sizing method and standards); water system and operation; and costs.
Related Products
AWWA ACE99429
Salem, Oregon, Expands and Improves its Slow Sand Filtration Facility to Prepare for Water Quality a..
$12.00 $24.00