• AWWA ACE92152
Provide PDF Format

Learn More

AWWA ACE92152

  • Operational and Water Quality Problems Associated With CT Compliance
  • Conference Proceeding by American Water Works Association, 01/01/1992
  • Publisher: AWWA

$12.00$24.00


Planning for the implementation of disinfection requirements at the South Central Connecticut Regional WaterAuthority's (RWA) three treatment facilities has been an interesting if not frustrating case study. The Lake Saltonstall Water Treatment Plant (WTP) proved to be the easiest facility to bring into compliance by simply elevating the prechlorine dose. The West River WTP was somewhat more challenging as the existing filtered water reservoirs (FWRs) needed to be modified to enhance their hydraulic flow characteristics. Installing a single vertical baffle wall in both FWRs was sufficient to provide the required level of disinfection. The Lake Gaillard WTP was the most challenging facility in terms of upgrading disinfection. Attempts to introduce several variations of prechlorination have resulted in a myriad of physical and chemical problems. Additionally, the elevated levels of THMs resulting from this process change are still being evaluated.

Related Products

AWWA WQTC55206

AWWA WQTC55206

Treatment Requirements for Microfiltration Residuals Intended for Recycle..

$12.00 $24.00

AWWA DSS92004

AWWA DSS92004

The Testing and Use of a Restrained, Field Adaptable, Flanging System for Ductile-Iron, PVC, and St..

$12.00 $24.00

AWWA WQTC52819

AWWA WQTC52819

Reservoir Management Approaches Exemplified..

$12.00 $24.00

AWWA WQTC52746

AWWA WQTC52746

ICR Microbiology Data--Temporal, Spatial and Source Water Characteristics..

$12.00 $24.00