• AWWA ACE92152
Provide PDF Format

Learn More

AWWA ACE92152

  • Operational and Water Quality Problems Associated With CT Compliance
  • Conference Proceeding by American Water Works Association, 01/01/1992
  • Publisher: AWWA

$12.00$24.00


Planning for the implementation of disinfection requirements at the South Central Connecticut Regional WaterAuthority's (RWA) three treatment facilities has been an interesting if not frustrating case study. The Lake Saltonstall Water Treatment Plant (WTP) proved to be the easiest facility to bring into compliance by simply elevating the prechlorine dose. The West River WTP was somewhat more challenging as the existing filtered water reservoirs (FWRs) needed to be modified to enhance their hydraulic flow characteristics. Installing a single vertical baffle wall in both FWRs was sufficient to provide the required level of disinfection. The Lake Gaillard WTP was the most challenging facility in terms of upgrading disinfection. Attempts to introduce several variations of prechlorination have resulted in a myriad of physical and chemical problems. Additionally, the elevated levels of THMs resulting from this process change are still being evaluated.

Related Products

AWWA B403-09

AWWA B403-09

Aluminum Sulfate - Liquid, Ground, or Lump..

$36.00 $71.00

AWWA WQTC64018

AWWA WQTC64018

Selecting and Piloting MF/UF Membranes for Proposed 12-mgd Water Treatment Plant..

$12.00 $24.00

AWWA SOURCES55721

AWWA SOURCES55721

Assessment of Microbial Risk Associated With Water Contact Recreation: A Dynamic Model..

$12.00 $24.00

AWWA JAW20170

AWWA JAW20170

Journal AWWA - Modeling TOC Removal by GAC: The General Logistic Function ..

$15.00 $30.00