Provide PDF Format
AWWA ACE92175
- Water Treatment Plant Planning for Water Quality Improvement Facilities
- Conference Proceeding by American Water Works Association, 01/01/1992
- Publisher: AWWA
$12.00$24.00
Periodic high turbidity events in the three reservoirs servicing The Greater Vancouver Water District (GVWD), an aggressive low pH finished water, and concern regarding the potential for Giardia has caused the District to proceed with a Water Quality Improvement Plan (WQIP) to 1) improve the disinfection process, 2) implement corrosion control facilities, and 3) implement a multi-barrier treatment concept for Giardia control. The scope of the District's improvement plan is substantial. Water demands, source water quality, water quality concerns, waterborne diseases, bacterial regrowth, high turbidity, pipeline corrosion, the three phases of the management plan, corrosion control alternatives, disinfection practices, and treatment processes are detailed.
Related Products
AWWA WQTC55206
Treatment Requirements for Microfiltration Residuals Intended for Recycle..
$12.00 $24.00
AWWA DSS92004
The Testing and Use of a Restrained, Field Adaptable, Flanging System for Ductile-Iron, PVC, and St..
$12.00 $24.00
AWWA WQTC52746
ICR Microbiology Data--Temporal, Spatial and Source Water Characteristics..
$12.00 $24.00