• AWWA ACE92194
Provide PDF Format

Learn More

AWWA ACE92194

  • Design of the Boynton Beach, Florida, Membrane Softening Water Treatment Plant
  • Conference Proceeding by American Water Works Association, 01/01/1992
  • Publisher: AWWA

$12.00$24.00


A feasibility study conducted in 1988 recommended treatment by membrane softening rather than lime softening for the City of Boynton Beach, Florida. Membrane softening would allow water hardness reduction to desired levels and would remove color and trihalomethane precursors present in the raw water to meet anticipated future drinking water regulations. The design of the facility, referred to as the West Water Treatment Plant, was started in the spring of 1989 after pilot testing. Construction is scheduled to be completed in May 1993. Plant sizing, process criteria, and plant features are briefly presented.

Related Products

AWWA INF53948

AWWA INF53948

A Toolkit for Water Main Renewal Planning..

$12.00 $24.00

AWWA INF53990

AWWA INF53990

Design Build of Innovative Ultrafiltration Plant Meets Water Quality Demands and Delivery Schedule..

$12.00 $24.00

AWWA WQTC50359

AWWA WQTC50359

Can the ICR Method Be Saved?..

$12.00 $24.00

AWWA JAW60537

AWWA JAW60537

Journal AWWA - Water-Soluble Pesticides in Finished Water of Community Water Supplies..

$15.00 $30.00