• AWWA ACE92215
Provide PDF Format

Learn More

AWWA ACE92215

  • Modification of Intakes & Pumps at Missouri River Plant
  • Conference Proceeding by American Water Works Association, 01/01/1992
  • Publisher: AWWA

$12.00$24.00


The purpose of the project described in this paper was to replace outdated pumps and drivers at the Florence Water Treatment Plant, (Omaha, Nebraska); isolate standby equipment from other pumping facilities for true standby capacity; and to alleviate low service pumpage problems at low river levels. The modification of the intakes and pumps provided a reliable capability to treat 60 mgd of Missouri River Water regardless of river level (ice jam) and availability of electric power. It also provides an alternative fuel source for base loading the high service pumping units at a substantial annual savings.

Related Products

AWWA QTC98339

AWWA QTC98339

The Next Generation of Cryptosporidium Detection Methods: Two-Colour Fluorescence, "Analysis-On..

$12.00 $24.00

AWWA SOURCES66599

AWWA SOURCES66599

The Final Solution: Budget-Based Rates for Landscape Irrigation..

$12.00 $24.00

AWWA WQTC63991

AWWA WQTC63991

Measurement of the Pharmaceutical Primidone as a Conservative Tracer of Wastewater Influences in Dri..

$12.00 $24.00

AWWA ACE93205

AWWA ACE93205

What You Don't Know About Backflow Could Hurt You (And Others)..

$12.00 $24.00