• AWWA ACE92215
Provide PDF Format

Learn More

AWWA ACE92215

  • Modification of Intakes & Pumps at Missouri River Plant
  • Conference Proceeding by American Water Works Association, 01/01/1992
  • Publisher: AWWA

$12.00$24.00


The purpose of the project described in this paper was to replace outdated pumps and drivers at the Florence Water Treatment Plant, (Omaha, Nebraska); isolate standby equipment from other pumping facilities for true standby capacity; and to alleviate low service pumpage problems at low river levels. The modification of the intakes and pumps provided a reliable capability to treat 60 mgd of Missouri River Water regardless of river level (ice jam) and availability of electric power. It also provides an alternative fuel source for base loading the high service pumping units at a substantial annual savings.

Related Products

AWWA JOINT53620

AWWA JOINT53620

JEA's Experience With Future Utility Management Issues..

$12.00 $24.00

AWWA ACE54274

AWWA ACE54274

Using Carbon Dioxide to Minimize Aluminum Residual, Optimize Coagulation for Turbidity Removal, and ..

$12.00 $24.00

AWWA ACE63151

AWWA ACE63151

Long-Term Impacts of Orthophosphate Treatment on Copper Levels..

$12.00 $24.00

AWWA ACE70756

AWWA ACE70756

Engineering Design of Water Treatment Process Units for Small Flows..

$12.00 $24.00