  • 1990s Expectations and 1950s Equipment: Chemical Feed Equipment Project at the Metropolitan Water District of Salt Lake City's Little Cottonwood Water Treatment Plant
  • Conference Proceeding by American Water Works Association, 01/01/1992
  • Publisher: AWWA

$12.00$24.00


In the early 1980s, the Metropolitan Water District of Salt Lake City decided to upgrade the Little Cottonwood Water Treatment Plant. The first step was prepare a Master Plan, which was completed in 1985. Replacing the chemical feed equipment was one element of the Master Plan. The District has also undertaken to: replace flights and chains in the sedimentation basins; improve the solids handling facilities; construction 10 million gallons of additional storage; install a Distributed Control System. The construction is scheduled for completion in March 1993, at an estimated cost of $1.6 million.

Related Products

AWWA JOINT53620

AWWA JOINT53620

JEA's Experience With Future Utility Management Issues..

$12.00 $24.00

AWWA ACE54274

AWWA ACE54274

Using Carbon Dioxide to Minimize Aluminum Residual, Optimize Coagulation for Turbidity Removal, and ..

$12.00 $24.00

AWWA ACE63151

AWWA ACE63151

Long-Term Impacts of Orthophosphate Treatment on Copper Levels..

$12.00 $24.00

AWWA ACE70756

AWWA ACE70756

Engineering Design of Water Treatment Process Units for Small Flows..

$12.00 $24.00