Provide PDF Format
AWWA ACE93048
- Compliance With the Lead Copper Rule
- Conference Proceeding by American Water Works Association, 01/01/1993
- Publisher: AWWA
$12.00$24.00
The main topics covered in this paper include the material survey, sampling plan, sample collection, and results interpretation. In addition, the paper includes an outline of the steps required when either of the action levels are exceeded at any stage of sampling.