• AWWA ACE93064
Provide PDF Format

Learn More

AWWA ACE93064

  • Developing and Using Reservoir Operating Curves to Maximize Surface Water Supply Yield
  • Conference Proceeding by American Water Works Association, 01/01/1993
  • Publisher: AWWA

$12.00$24.00


This presentation will describe a simple method which can be used by even the smallest suppliers to develop operating guidelines for their reservoirs. These guidelines will be presented in graphical form as a "reservoir operating curve." This curve can be used to visually track operating levels, and establish "trigger points" at which cut-backs in withdrawals can be made to avoid over-depletion or even emptying of the reservoir.

Related Products

AWWA DSS63729

AWWA DSS63729

Horizontal Directional Drilling with Ductile Iron Pipe..

$12.00 $24.00

AWWA WQTC62395

AWWA WQTC62395

Endotoxin in Drinking Water: Occurrence, Inactivation, and Potential Risk to Human Health..

$12.00 $24.00

AWWA C800-89

AWWA C800-89

Underground Service Line Valves and Fittings (Includes Collected Standards for Service Line Material..

$23.00 $45.00

AWWA CONS50896

AWWA CONS50896

Practical Aspects of Household Graywater Recycling..

$12.00 $24.00