• AWWA ACE93199
Provide PDF Format

Learn More

AWWA ACE93199

  • Pilot Testing for Membrane System Design
  • Conference Proceeding by American Water Works Association, 01/01/1993
  • Publisher: AWWA

$12.00$24.00


Pilot tests can be divided into two categories depending on the degree of process development. Development tests help create process designs. Demonstration tests validate existing designs. In membrane tests, the critical parameters are: feedwater source (well, surface, waste), feedwater chemical makeup, pretreatment process and conditions, recovery, membrane geometry, and flow velocities. Two case histories illustrate requirements of pilot plants and the potential for disaster in relying on invalid test results. The first is an ultrafiltration system that is part of a wastewater treatment plant, and the second is a waste water recovery system for a metals finishing plant.

Related Products

AWWA JAW23801

AWWA JAW23801

Journal AWWA - Controlling Swampy Odors in Drinking Water ..

$15.00 $30.00

AWWA DSS60350

AWWA DSS60350

Design, Construction and Operation of Denver's New Recycled Water System..

$12.00 $24.00

AWWA JAW64847

AWWA JAW64847

Journal AWWA - Process-Train Profiles of NOM through a Drinking Water Treatment Plant..

$15.00 $30.00

AWWA JAW59515

AWWA JAW59515

Journal AWWA - Expanded Summary: Protecting Watersheds from Cryptosporidium in Manure: A Literature ..

$15.00 $30.00