• AWWA ACE93247
Provide PDF Format

Learn More

AWWA ACE93247

  • A New Water Plant for a New Supply at Tucson, Arizona
  • Conference Proceeding by American Water Works Association, 01/01/1993
  • Publisher: AWWA

$12.00$24.00


Through careful study of energy alternatives and creative design Tucson has the option to determine the best pump drivers and negotiate the most favorable energy rates for their raw water pump station. Pilot testing and flexible plant design can optimize the process for the water and provide the required horsepower to handle unusual situations. The control system can increase operator efficiency and allow the process to be refined and controlled by minimal staff.

Related Products

AWWA JAW23801

AWWA JAW23801

Journal AWWA - Controlling Swampy Odors in Drinking Water ..

$15.00 $30.00

AWWA DSS60350

AWWA DSS60350

Design, Construction and Operation of Denver's New Recycled Water System..

$12.00 $24.00

AWWA JAW64847

AWWA JAW64847

Journal AWWA - Process-Train Profiles of NOM through a Drinking Water Treatment Plant..

$15.00 $30.00

AWWA JAW59515

AWWA JAW59515

Journal AWWA - Expanded Summary: Protecting Watersheds from Cryptosporidium in Manure: A Literature ..

$15.00 $30.00