• AWWA ACE93251
Provide PDF Format

Learn More

AWWA ACE93251

  • State Water for Santa Barbara County: Pipeline Design Through an Environmentally Sensitive Area
  • Conference Proceeding by American Water Works Association, 01/01/1993
  • Publisher: AWWA

$12.00$24.00


This paper is for those of you who have not yet been involved in the design or construction of a pipeline that requires revegetation of native and non-native plant species, realignment to avoid archeological features, schedule restrictions due to bird nesting, full time mitigation monitors and a spill contingency plan for treated water. First, this paper will provide brief background information regarding the State Water Project and the Coastal Branch of the State Water Project. Next, the specific environmental issues that needed to be addressed during the design of this pipeline will be described. This will be followed by a description of the approach used to address environmental concerns. A number of examples will be provided of project features designed to address the environmental concerns. Conclusions will summarize what has been learned during the design of an environmentally sensitive pipeline.

Related Products

AWWA ACE95152

AWWA ACE95152

Linking SCADA With Network Simulation..

$12.00 $24.00

AWWA DSS62074

AWWA DSS62074

Lake Tawakoni 84-Inch Raw Water Pipeline Repairs: Hunt, Van Zandt and Kaufman Counties, Texas..

$12.00 $24.00

AWWA ACE71086

AWWA ACE71086

Embedded Energy in Water: What are the Issues? How Can Water Efficiency Help?..

$12.00 $24.00

AWWA IMTECH51431

AWWA IMTECH51431

Intranet Data Access and Linking to External Databases..

$12.00 $24.00