• AWWA ACE94027
Provide PDF Format

Learn More

AWWA ACE94027

  • Integrated Project Teams: A Strategy for Success in the 90s
  • Conference Proceeding by American Water Works Association, 01/01/1994
  • Publisher: AWWA

$12.00$24.00


In today's tight economic environment, public works managers are faced with the dilemma of implementing large civil and environmental projects and programs while at the same time keeping costs and staff levels down. The traditional approach has been either to hire consultants or to use in-house staff. There are advantages and disadvantages to both approaches. However, there is a third approach which combines the advantages of both traditional approaches, yet minimizes the disadvantages, i.e., integrating a project team to include a mixture of public (agency) and private (consultant) staff. The co-authors have just completed a major design project using an integrated design team approach. This paper presents a discussion of the project, the reasoning behind use of an integrated team, the issues facing such an integration, and several key observations regarding how this team worked together to accomplish Metropolitan's objectives.

Related Products

AWWA MTC61189

AWWA MTC61189

Brackish Water Desalination Facilities..

$12.00 $24.00

AWWA ACE94274

AWWA ACE94274

Implementation of a Computerized Maintenance Management System by the Metropolitan District Commiss..

$12.00 $24.00

AWWA C300-97

AWWA C300-97

Reinforced Concrete Pressure Pipe, Steel-Cylinder Type, for Water and Other Liquids..

$23.00 $45.00

AWWA QTC98290

AWWA QTC98290

Application of Pathogen Surrogates to Improve Treatment Plant Performance..

$12.00 $24.00