• AWWA ACE94288
Provide PDF Format

Learn More

AWWA ACE94288

  • Moving Into Uncharted Water With an Ozone Disinfection Facility
  • Conference Proceeding by American Water Works Association, 01/01/1994
  • Publisher: AWWA

$12.00$24.00


In anticipation of applying for an exception from filtration, the District contracted with Camp Dresser & McKee Inc. (CDM) in January, 1988, to conduct a study to determine the feasibility of using ozonation as the primary disinfectant to meet the SWTR requirements for its Sebago Lake water supply. After successfully conducting pilot scale tests between March 1988 and January 1989, CDM designed a 52-mgd "stand-alone" ozone disinfection facility, the first of its kind in the US. This paper describes the system configuration, including: the design of the ozone contact tanks and diffusers; the control system; and the feed gas systems.

Related Products

AWWA 51840

AWWA 51840

10 Years of UK Water Privatisation: A Stakeholder Review..

$12.00 $24.00

AWWA WQTC71365

AWWA WQTC71365

Ceramic Membrane Testing with Ozone in Singapore..

$12.00 $24.00

AWWA WQTC69492

AWWA WQTC69492

Ozone Oxidation of Pharmaceuticals, Pesticides and Endocrine Disruptors during Drinking Water Treatm..

$12.00 $24.00

AWWA DSS71297

AWWA DSS71297

Hydromon™: The First Built-In On-Line Quality Monitoring System in a Public Supply Network..

$12.00 $24.00