• AWWA ACE95049
Provide PDF Format

Learn More

AWWA ACE95049

  • From Model to Full Scale: Modification of a Reservoir to Improve Contact Time
  • Conference Proceeding by American Water Works Association, 01/01/1995
  • Publisher: AWWA

$12.00$24.00


Like many utilities using surface water, ACWD is faced with the challenge of meeting the disinfection requirements of the Surface Water Treatment Rule while also minimizing disinfection byproduct formation. These two competing objectives were motivation behind this plant modification project. This paper discusses the proposed modifications, describes the modeling study and results, and details the implementation of the full-scale modification process. The full-scale project involved modifications to the treated water reservoir, new processes for continuous sampling (upstream and downstream), and comprehensive test and start-up plans.

Related Products

AWWA ACE95260

AWWA ACE95260

Determination of Technology and Costs for GAC Treatment Using the ICR Methodology..

$12.00 $24.00

AWWA ACE56250

AWWA ACE56250

The Benefits of Lining Large Diameter Pipes With Polyurethane..

$12.00 $24.00

AWWA D115-95

AWWA D115-95

Circular Prestressed Concrete Water Tanks With Circumferential Tendons..

$34.00 $68.00

AWWA MTC95013

AWWA MTC95013

Membrane Protocol to Meet the ICR..

$12.00 $24.00