• AWWA ACE99320
Provide PDF Format

Learn More

AWWA ACE99320

  • "Design/Build/Maintain Project Delivery Minimizes Risks While Ensuring Quality for Detroit's New 240-MGD Water Treatment Plant"
  • Conference Proceeding by American Water Works Association, 01/01/1999
  • Publisher: AWWA

$12.00$24.00


This paper discusses a construction project that involved building a new 240 mgd water treatment plant (WTP) at Detroit Water and Sewerage Department's (DWSD) Water Works Park site. The new plant would lower operating and maintenance costs, have a longer useful life, and allow DWSD to comply with anticipated more stringent water quality regulations. DWSD recognized that a Design/Build approach would encourage innovation and would significantly shorten the project delivery schedule for the new WTP, reducing the amount of time the existing plant would need to be kept operational. To ensure that the Design/Builder provided a low maintenance, high quality plant, it was decided to make the contractor responsible for all maintenance for the first seven years of plant operation. In December 1996, a 6-month pilot study was started to establish the Basis of Design for the new WTP. During the pilot study, the requirements for the project and the Design/Build/Maintain contractor selection procedure were determined. Further contractural terms are discussed.

Related Products

AWWA ACE95265

AWWA ACE95265

Remote Monitoring and Control of Small Drinking Water Package Plant Systems..

$12.00 $24.00

AWWA JAW41457

AWWA JAW41457

Journal AWWA - Legislation/Regulation -- Inside the Information Collection Rule..

$15.00 $30.00

AWWA ACE68890

AWWA ACE68890

Do It Right: A Structured Approach to Selecting a Project Delivery Method..

$12.00 $24.00

AWWA ACE63006

AWWA ACE63006

Water Management Planning: A Case Study at Blue Grass Army Depot..

$12.00 $24.00