• AWWA ACE99439
Provide PDF Format

Learn More

AWWA ACE99439

  • The Use of Private Sector Techniques in Delivering a Municipal Water Supply Project in Sussex Wisconsin
  • Conference Proceeding by American Water Works Association, 01/01/1999
  • Publisher: AWWA

$12.00$24.00


In the summer of 1998 the village of Sussex, Wisconsin, performed a wellhouse rehabilitation project to upgrade a 28-year old facility. The scope of the project was too small to attract competitive bids from larger general contractors. The Village called on the private sector design/build experience of a local engineering firm that developed a scope of improvements that could be performed by local tradesmen, using locally purchased products. The team developed an approach that satisfied statutory requirements for competitive bidding of public construction, yet allowed the team to act as a kind of General Contractor. This arrangement allowed the Village to define and control the schedule, scope, and cost of the project. Objectives for the improvements project are listed.

Related Products

AWWA ACE95045

AWWA ACE95045

Pilot Scale Evaluation of Residuals Management Options..

$12.00 $24.00

AWWA WQTC64008

AWWA WQTC64008

Validation of Full-scale Ozone Contactor Performance Using Biodosimetry..

$12.00 $24.00

AWWA JAW55967

AWWA JAW55967

Chlorine Demand in Disinfecting Water Mains..

$15.00 $30.00

AWWA ACE54338

AWWA ACE54338

Harnessing the Positive Power of Change: Integrating Strategic Business and Strategic Information Sy..

$12.00 $24.00