  • Ozone Facilities Project in Milwaukee: The Design/Build Experience
  • Conference Proceeding by American Water Works Association, 01/01/1999
  • Publisher: AWWA

$12.00$24.00


In April of 1993 the City of Milwaukee and surrounding service area experienced an outbreak of Cryptosporidiosis. The Departrment of Public Works, immediately following this outbreak, directed a water system evaluaton study, which recommended three major improvements for consideration to the water treatment system: improved particle and turbidity removal by filtration and chemical feed systems upgrades; extension of the pumping station's raw water intake to improve source water quality for the purification plant; and, installation of ozonation faciliites as the primary disinfectant. The third item, ozonation, was chosen and is the subject of this paper. Topics covered include: ozone RFP 30% design; ozone 30% design and recommendations; feasibility of design/build; design/build procurement; request for qualifications, ozone design/build; request for proposals, ozone facilities; design/build agreement; ozone facilities implementaton; and, ozone as a primary disinfectant.

Related Products

AWWA WQTC57029

AWWA WQTC57029

LIMS is Not Only for the Laboratory, It's for Clients Too..

$12.00 $24.00

AWWA ACE70831

AWWA ACE70831

Lead (Pb) in Drinking Water and Associated Public Health Risk..

$12.00 $24.00

AWWA ACE56313

AWWA ACE56313

Which Nitrate Removal Technology is Right for You?..

$12.00 $24.00

AWWA CSC94001

AWWA CSC94001

Feed Forward Chlorine Dose Control to Counteract Sudden Ammonia Increase in Water Purification Plan..

$12.00 $24.00