• AWWA CSC91079
Provide PDF Format

Learn More

AWWA CSC91079

  • Energy Management by Pump Scheduling
  • Conference Proceeding by American Water Works Association, 01/01/1991
  • Publisher: AWWA

$12.00$24.00


This paper looks at energy management by pump scheduling using a software package called WATCHMAN1. The objective of pump scheduling is to supply demand at minimum operating cost while satisfying all operating constraints. This is achieved by choosing which sources and pumps to use, at what times and at what speed. Factors which affect cost include electricity tariff structure, pumpset efficiencies, marginal cost of treatment and the heads developed by the pumps. The constraining rules include allowable reservoir levels, pump availability, works throughput limitations and system pressure rules. For all but the simplest of system, it is a difficult task to find the true global optimum and satisfy all the operating rules. A case study shows how the software maximizes energy efficiency.

Related Products

AWWA ACE70683

AWWA ACE70683

Integration and Inclusion: Moving the Greater Los Angeles County Integrated Regional Water Managemen..

$12.00 $24.00

AWWA WQTC71342

AWWA WQTC71342

Determining the Frequency of Unidirectional Flushing in a System with Multiple Entry Points Having D..

$12.00 $24.00

AWWA ACE93010

AWWA ACE93010

Water Conservation Rate Structures..

$12.00 $24.00

AWWA WSC61371

AWWA WSC61371

Case Study of Contra Costa Water District's Security Improvement Program..

$12.00 $24.00