• AWWA CSC91092
Provide PDF Format

Learn More

AWWA CSC91092

  • A Fast-Track SCADA Project for the World's Largest New Potable Water System
  • Conference Proceeding by American Water Works Association, 01/01/1991
  • Publisher: AWWA

$12.00$24.00


The DuPage Water Commission is in the procurement phase of a Supervisory Control and Data Acquisition system and its associated instrumentation for a major new potable water system. This paper briefly describes the water system, the SCADA system design, and the fast track management techniques used on the overall construction project. The innovative techniques employed to accomplish a $3 million plus SCADA project within 2 years are highlighted. Of special note is the use of point-to-multipoint data acquisition radio and point-to-point microwave radio. Characteristics of the SCADA system are listed. The key to the project's success was its planning, organization, staffing, and management. A number of features that allowed speedy implementation of the SCADA system are listed. An investment of 3-4 months at the start of the project, in detailed requirements definition and planning, saved a year in the overall schedule.

Related Products

AWWA ACE70683

AWWA ACE70683

Integration and Inclusion: Moving the Greater Los Angeles County Integrated Regional Water Managemen..

$12.00 $24.00

AWWA WQTC71342

AWWA WQTC71342

Determining the Frequency of Unidirectional Flushing in a System with Multiple Entry Points Having D..

$12.00 $24.00

AWWA ACE93010

AWWA ACE93010

Water Conservation Rate Structures..

$12.00 $24.00

AWWA WSC61371

AWWA WSC61371

Case Study of Contra Costa Water District's Security Improvement Program..

$12.00 $24.00