• AWWA CSC92048
Provide PDF Format

Learn More

AWWA CSC92048

  • Control System Procurement Options for Water Utilities
  • Conference Proceeding by American Water Works Association, 01/01/1992
  • Publisher: AWWA

$12.00$24.00


The difficulties of maintaining a level playing field for vendors to compete and ensuring that competing vendors are proposing systems that are comparable has often created untenable situations for utilities, consultants, and vendors alike. Alternate methods of procurement are available that do the following: Avoid the creation of adversarial relationships among the utility, engineer, and vendor; Provide an opportunity for utilities to take advantage of superior features and technologies that may have value to them; Save time and money in the design and installation of their system; Create an atmosphere of partnering and beneficial long term relationships.

Related Products

AWWA MTC61119

AWWA MTC61119

Planning and Design for a Large Membrane Bioreactor System..

$12.00 $24.00

AWWA MTC61089

AWWA MTC61089

California's Approach to Assignment of Pathogen Removal Credits and Membrane Acceptance as an Altern..

$12.00 $24.00

AWWA JAW18766

AWWA JAW18766

Journal AWWA - Returning Recently Covered Reservoirs to Service: Health and Aesthetic Considerations..

$15.00 $30.00

AWWA JAW51659

AWWA JAW51659

Journal AWWA - Increasing Alkalinity to Reduce Turbidity..

$15.00 $30.00