• AWWA CSC92099
Provide PDF Format

Learn More

AWWA CSC92099

  • Schedule-Based Control Reduces Electrical Costs
  • Conference Proceeding by American Water Works Association, 01/01/1992
  • Publisher: AWWA

$12.00$24.00


This paper describes a technique to minimize electrical costs for water distribution, and examines a case study of a water system using this technique. The technique depends on scheduling reservoir filling to avoid pumping during high energy cost periods. The technique is described by first discussing standard techniques for reservoir control. The reservoir scheduling technique is defined and then operational aids are developed. The case study is based on water distribution in Reno, Nevada. The Westpac Utilities Division of Sierra Pacific Power Company recently completed installation of a new SCADA system that uses this reservoir scheduling technique. The case study will examine: operational characteristics of the Westpac Water Distribution System; the electrical rate structure; the expected cost savings from reservoir scheduling; and initial system operations observations.

Related Products

AWWA ACE56220

AWWA ACE56220

A Study of Regulatory Approaches to Aquifer Storage Recovery in the United States..

$12.00 $24.00

AWWA SOURCES55658

AWWA SOURCES55658

Reuse Nevada: A Winning Combination..

$12.00 $24.00

AWWA QTC97119

AWWA QTC97119

Laser Scanning Device for Detecting Cryptosporidium..

$12.00 $24.00

AWWA IMTECH62903

AWWA IMTECH62903

Billing and Metering Inconsistencies in Utility Customer Service Operations in the United States..

$12.00 $24.00