• AWWA CSC94042
Provide PDF Format

Learn More

AWWA CSC94042

  • CAP Plant Intensifies Lab Management Issues at Tucson Water
  • Conference Proceeding by American Water Works Association, 01/01/1994
  • Publisher: AWWA

$12.00$24.00


Tucson Water's workload has been increasing in size and complexity for several years, growing to the point where the laboratory was becoming unable to successfully meet commitments and regulatory requirements. A large part of the problem has been addressed by implementation of a LIMS, including several customized programs to handle sample scheduling, QA/QC, and microbiological benchsheets. It is Tucson Water's expectation that the LIMS will enable the lab to better meet increasing requirements while minimizing staff increases.

Related Products

AWWA WaterStats4ev2

AWWA WaterStats4ev2

WATER:\STATS 1996 Survey, Water Quality and General Information (MS EXCEL FORMAT)..

$66.00 $132.00

AWWA JAW48132

AWWA JAW48132

Journal AWWA - Legislation/Regulation -- Drinking Water Contaminant Candidate List Released..

$15.00 $30.00

AWWA WQTC60573

AWWA WQTC60573

The Power of LC/MS and LC/MS/MS Technology: Direct Analysis of Polar Water Contaminants..

$12.00 $24.00

AWWA ACE92059

AWWA ACE92059

Characteristics of Conservation-Oriented Rates..

$12.00 $24.00