• AWWA DSS54634
Provide PDF Format

Learn More

AWWA DSS54634

  • Selecting Cast Iron Water Mains From a Backlog of Replacements - Making the Best of a Bad Situation
  • Conference Proceeding by American Water Works Association, 09/01/2001
  • Publisher: AWWA

$12.00$24.00


Many water utilities are faced with a backlog of cast iron water mains that have reached the end of their economic life. With backlogs exceeding annual replacement budgets, utility managers must decide which mains to replace, and which to defer. Performance and economics models were used to evaluate the economics of replacement cirteria that prioritizes candidates that include: MEEL break; hazard function; and shortest segments. A "hotspot" replacement strategy is used as an alternative to full block replacement to better utilize annual replacement funding. The impact to customers and the cost to the utility, and ultimately the consumer, were considered in making the best of a bad situation. Includes 6 references, tables, figures.

Related Products

AWWA DSS54638

AWWA DSS54638

Developing a SCADA System to Maximize Operational Efficiency..

$12.00 $24.00

AWWA WQTC55110

AWWA WQTC55110

Health Risks From Cyanobacterial Toxin Exposure..

$12.00 $24.00

AWWA QTC98362

AWWA QTC98362

Analyses and Interpretation of the Physical, Chemical and Biological Characteristics of Distribution..

$12.00 $24.00

AWWA JAW65524

AWWA JAW65524

Journal AWWA - Expanding a Conventional Water Treatment Plant with Low-pressure Membranes..

$15.00 $30.00