• AWWA DSS58692
Provide PDF Format

Learn More

AWWA DSS58692

  • Reservoir Rehabilitation or Demolition? How and Why the City of Huntington Beach Chose to do Both
  • Conference Proceeding by American Water Works Association, 10/01/2003
  • Publisher: AWWA

$12.00$24.00


This paper explores the collaboration between City of Huntington Beach, California staff and the design teamto develop innovative ideas to resolve difficult design, construction andoperational issues for the Overmyer Reservoir Renovation Project inHuntington Beach, California. Includes tables.

Related Products

AWWA WQTC65928

AWWA WQTC65928

Low Cost Ceramic Membrane Filtration for Application in Developing Countries: The Ceramic Silver-Imp..

$12.00 $24.00

AWWA WQTC71420

AWWA WQTC71420

Characterization of a Highly Fouling Fraction of Algogenic Organic Matter in Low- and High-Pressure ..

$12.00 $24.00

AWWA ACE94085

AWWA ACE94085

Well Head Protection - A Cost Effective Way of Protecting Our Ground Water Resources..

$12.00 $24.00

AWWA JAW34118

AWWA JAW34118

Journal AWWA - An Analysis of Low-Level Turbidity Measurements..

$15.00 $30.00