Provide PDF Format
AWWA DSS58692
- Reservoir Rehabilitation or Demolition? How and Why the City of Huntington Beach Chose to do Both
- Conference Proceeding by American Water Works Association, 10/01/2003
- Publisher: AWWA
$12.00$24.00
This paper explores the collaboration between City of Huntington Beach, California staff and the design teamto develop innovative ideas to resolve difficult design, construction andoperational issues for the Overmyer Reservoir Renovation Project inHuntington Beach, California. Includes tables.
Related Products
AWWA WQTC69492
Ozone Oxidation of Pharmaceuticals, Pesticides and Endocrine Disruptors during Drinking Water Treatm..
$12.00 $24.00
AWWA DSS71297
Hydromon™: The First Built-In On-Line Quality Monitoring System in a Public Supply Network..
$12.00 $24.00