• AWWA DSS60336
Provide PDF Format

Learn More

AWWA DSS60336

  • Bringing a River Water Treatment Plant into Compliance Cost Effectively
  • Conference Proceeding by American Water Works Association, 09/29/2004
  • Publisher: AWWA

$12.00$24.00


This slide presentation outlines information on a project to bring the City of East Moline Water Treatment Plant into compliance with the Interim Enhanced Surface Water Treatment Rule and the Disinfectants/Disinfection Byproducts Rule (D/DBPR). Other concerns included: meeting the requirements of future regulations such as the Filter Backwash Rule and the Stage 2 Microbial and D/DBPR, ensuring proper chemical pretreatment, ensuring proper rapid mix and flocculation, and reducing finished water turbidity. Topics covered include: seasonal water quality issues; historical water quality summary; site plan; improvements to raw water pumps, rapid mix basins, flocculation and sedimentation basins; alternative treatment technologies; estimate of probable construction costs; and, results of the effort.

Related Products

AWWA ACE56251

AWWA ACE56251

City of Cocoa, Florida, Trenchless Technology Approach Using Horizontal Directional Drilling for Reh..

$12.00 $24.00

AWWA WQTC69488

AWWA WQTC69488

Short-Term Variations in DBP Concentrations at the Point of Entry to the Distribution System..

$12.00 $24.00

AWWA ACE58340

AWWA ACE58340

A Tool Kit for Water Efficiency Practitioners: Calculation Shortcuts and Rules of Thumb for Commerci..

$12.00 $24.00

AWWA IMTECH57854

AWWA IMTECH57854

Innovative Applications Using a CMMS for the Boston Water and Sewer Commission..

$12.00 $24.00