• AWWA DSS62063
Provide PDF Format

Learn More

AWWA DSS62063

  • Incorporating Optimization into a Phased Water Master Plan
  • Conference Proceeding by American Water Works Association, 09/01/2005
  • Publisher: AWWA

$12.00$24.00


This paper discusses the Water System Master Plan developed by the Butler County Department of Environmental Services (BCDES) in southwestern Ohio. The service area has been experiencing rapid growth, and BCDES faced unique operational and planning challenges. They currently purchase water from two different regionalsuppliers and are governed by contractual conditions with each supplier, includingminimum purchase requirements. There are three main supply connection points with thewater suppliers. Future improvements will add at least two more major supplyconnections to provide redundancy in the BCDES system and to enhance the suppliers'ability to deliver peak flows through flow splitting. Demand projections, distribution system analysis, optimization approach, and alternatives analysis are discussed. Includes 3 references, table, figure.

Related Products

AWWA WQTC65766

AWWA WQTC65766

Impact of MIEX Pretreatment on Downstream Conventionally Treated Water Quality Parameters..

$12.00 $24.00

AWWA WQTC57187

AWWA WQTC57187

Bromate Control During Ozonation of High-Bromide Drinking Water..

$12.00 $24.00

AWWA WQTC58965

AWWA WQTC58965

Assessment of Arsenic Treatment Alternatives for Source Waters in New Jersey, California, and Arizon..

$12.00 $24.00

AWWA ACE70521

AWWA ACE70521

Sinkzilla: Managing Media during an Interstate Disaster..

$12.00 $24.00