• AWWA DSS62079
Provide PDF Format

Learn More

AWWA DSS62079

  • Modified Design/Build Approach for New Membrane Filtration Facility in Idaho
  • Conference Proceeding by American Water Works Association, 09/01/2005
  • Publisher: AWWA

$12.00$24.00


This slide presentation outlines a modified design/build approach for a new membrane filtration facility at the Columbia Water Treatment Plant in Idaho. Topics covered include: selection of membrane filtration; design/build contract; modified project approach; plant overview; final design; construction; and, realized benefits of D/B approach.

Related Products

AWWA IMTECH64732

AWWA IMTECH64732

The Letter of X's Report: A Web-Based Tool to Track Equipment Operator Qualifications..

$12.00 $24.00

AWWA 51483

AWWA 51483

Can a Sustainable Water Supply Be Developed Through a Collaborative Decision-Making Process?..

$12.00 $24.00

AWWA WQTC71455

AWWA WQTC71455

Urban Source Protection: Identification of Contamination Sources with a Geographical Information Sys..

$12.00 $24.00

AWWA ACE95244

AWWA ACE95244

West Basin Municipal Water District: Groundwater Augmentation Project..

$12.00 $24.00