Provide PDF Format
AWWA DSS62080
- How to Build a Water Treatment Plant at a Greenfield Site?
- Conference Proceeding by American Water Works Association, 09/01/2005
- Publisher: AWWA
$12.00$24.00
This slide presentation outlines the building of a water treatment plant at a greenfield site. Topics covered include: planning of plant location,hydraulic capacity,water quality, andprocess selection;conceptual design ofhydraulic gradeline,design criteria, and site layout; and, procurement. A case study is presented.