• AWWA DSS69157
Provide PDF Format

Learn More

AWWA DSS69157

  • Central Feeder Pipeline Project
  • Conference Proceeding by American Water Works Association, 11/01/2008
  • Publisher: AWWA

$12.00$24.00


This powerpoint presentation begins by presenting study objectives that include the following:relieve areas of high groundwater; and,provide additional water supply to Metropolitan Water District of Southern California.The project required meeting the requirementsof two important regional clients, San Bernardino Valley Municipal Water District andMetropolitan Water District of Southern California. The overall project was implemented in a phasedapproach to meet Metropolitan's growing demands, and several key issues were resolved duringpreliminary design related toproject water supply, hydraulics, andfacilities development. Final design and construction was divided into 4 tasks: Task 1 - Phase 1A Pipeline and Intertie Vaults;Task 2 - Phase 1B Pipeline;Task 3 - Pump Station Design; and,Task 4 - Pump Station Construction.

Related Products

AWWA MTC61143

AWWA MTC61143

Evaluating Chloramines for Control of RO Membrane Biofouling with Ground and Surface Water Supplies..

$12.00 $24.00

AWWA WQTC52757

AWWA WQTC52757

Pilot Scale Evaluation of Disinfection By-Product Formation With Intermediate Ozone and Post Filtrat..

$12.00 $24.00

AWWA IMTECH54046

AWWA IMTECH54046

Optimal Reliability for Multi-Source Water Distribution Systems..

$12.00 $24.00

AWWA JAW6112

AWWA JAW6112

Journal AWWA - Discussion: The Use of Chloramines to Prevent Trihalomethane Formation in Huron, S.D...

$15.00 $30.00