• AWWA DSS69207
Provide PDF Format

Learn More

AWWA DSS69207

  • Planning the Program: Implementing Condition Assessment Technologies
  • Conference Proceeding by American Water Works Association, 11/01/2008
  • Publisher: AWWA

$12.00$24.00


This powerpoint presentation begins by providing an outline of a plan formanagement of pipeline infrastructure. The five key elements of pipeline management are presented and include: strategy; review inventory; prioritize; implementation planning; and technology assessment. Various technologies for pipeline conditionassessment are presented and include:Visual Inspection;Closed Circuit TV;Electromagnetics (Broad Band and Remote Field); Ultrasonic (G-Wave, B-Scan, Impact Echo);Remote Field Eddy Current/Transformer Coupling;Acoustic Emission Monitoring;Leak Detection; and,Magnetic Flux Leakage (Primarily Oil & Gas). Sahara® Leak Detection Technology is presented. Includes figures.

Related Products

AWWA JAW23801

AWWA JAW23801

Journal AWWA - Controlling Swampy Odors in Drinking Water ..

$15.00 $30.00

AWWA DSS60350

AWWA DSS60350

Design, Construction and Operation of Denver's New Recycled Water System..

$12.00 $24.00

AWWA JAW64847

AWWA JAW64847

Journal AWWA - Process-Train Profiles of NOM through a Drinking Water Treatment Plant..

$15.00 $30.00

AWWA JAW59515

AWWA JAW59515

Journal AWWA - Expanded Summary: Protecting Watersheds from Cryptosporidium in Manure: A Literature ..

$15.00 $30.00