AWWA DSS71323
- Water Production and Distribution Real-Time Energy Management
- Conference Proceeding by American Water Works Association, 11/01/2009
- Publisher: AWWA
$12.00$24.00
This powerpoint presentation begins by providing a brief overview of the Gwinnett County Department of Water Resources Energy Management and Operations (EM&O) Optimization Project, including optimization project drivers and initial feasibility study analysis. Detailed design of EM&O is presented, including:system configuration and benefits;HAZOP meetings and constraints;hydraulic analysis;feasibility study and savings review;EMS software design specification; and,SCADA / HMI interface and IT Design. The implementation plan and schedule is presented, along with a review of savings and return on investment. Includes tables, figures.