• AWWA DSS71323
Provide PDF Format

Learn More

AWWA DSS71323

  • Water Production and Distribution Real-Time Energy Management
  • Conference Proceeding by American Water Works Association, 11/01/2009
  • Publisher: AWWA

$12.00$24.00


This powerpoint presentation begins by providing a brief overview of the Gwinnett County Department of Water Resources Energy Management and Operations (EM&O) Optimization Project, including optimization project drivers and initial feasibility study analysis. Detailed design of EM&O is presented, including:system configuration and benefits;HAZOP meetings and constraints;hydraulic analysis;feasibility study and savings review;EMS software design specification; and,SCADA / HMI interface and IT Design. The implementation plan and schedule is presented, along with a review of savings and return on investment. Includes tables, figures.

Related Products

AWWA ACE65201

AWWA ACE65201

Planning for Knowledge Retention Now Saves Valuable Organizational Resources Later..

$12.00 $24.00

AWWA JAW17549

AWWA JAW17549

Journal AWWA - 226Ra and 228Ra in Water Supplies ..

$15.00 $30.00

AWWA ACE99544

AWWA ACE99544

GAC and PAC Systems Analysis: Implications of the Regulation of s-Triazine Metabolites..

$12.00 $24.00

AWWA JAW48150

AWWA JAW48150

Journal AWWA - SDWA Capacity Development..

$15.00 $30.00