• AWWA DSS71323
Provide PDF Format

Learn More

AWWA DSS71323

  • Water Production and Distribution Real-Time Energy Management
  • Conference Proceeding by American Water Works Association, 11/01/2009
  • Publisher: AWWA

$12.00$24.00


This powerpoint presentation begins by providing a brief overview of the Gwinnett County Department of Water Resources Energy Management and Operations (EM&O) Optimization Project, including optimization project drivers and initial feasibility study analysis. Detailed design of EM&O is presented, including:system configuration and benefits;HAZOP meetings and constraints;hydraulic analysis;feasibility study and savings review;EMS software design specification; and,SCADA / HMI interface and IT Design. The implementation plan and schedule is presented, along with a review of savings and return on investment. Includes tables, figures.

Related Products

AWWA ACE93094

AWWA ACE93094

Ultraviolet Light -- An Alternative Disinfectant for Reclaimed Water..

$12.00 $24.00

AWWA ACE95247

AWWA ACE95247

Enhanced Coagulation: Effect on Particle Size and Residual Dewaterability..

$12.00 $24.00

AWWA WQTC57172

AWWA WQTC57172

Coliphages as Indicators of Viral Contamination in Water..

$12.00 $24.00

AWWA WQTC52985

AWWA WQTC52985

Removal of Emerging Waterborne Pathogens by Pilot-Scale Conventional Treatment..

$12.00 $24.00