• AWWA DSS90004
Provide PDF Format

Learn More

AWWA DSS90004

  • Cross Connection Control Inspection Procedures
  • Conference Proceeding by American Water Works Association, 01/01/1990
  • Publisher: AWWA

$12.00$24.00


Inspection can mean the difference between an effective cross connection control program and a paper tiger. Coordination and education can accomplish a large portion of the work necessary in a program; regulation makes up the rest. Each of these aspects is present in the individual activities which are included in the inspection function: assessing the system, selecting a strategy, preparing yourself, inspecting existing facilities, review plans, and inspecting new construction. These procedures, properly set up and adhered to, can simplify cross connection control program management.

Related Products

AWWA B453-01

AWWA B453-01

AWWA Standard for Polyacrylamide..

$21.00 $42.00

AWWA ACE99368

AWWA ACE99368

Chlorine Dioxide: An Attractive Alternative for Algae Control in Open, Finished-Water Reservoirs..

$12.00 $24.00

AWWA ACE63007

AWWA ACE63007

Biodegradation of HAAs in Slow Sand Filtration Units..

$12.00 $24.00

AWWA JAW31617

AWWA JAW31617

Journal AWWA - Avoiding Litigation and Preserving Public Confidence Through Compliance Auditing..

$15.00 $30.00