• AWWA DSS92009
Provide PDF Format

Learn More

AWWA DSS92009

  • Basic Distribution System Maintenance
  • Conference Proceeding by American Water Works Association, 01/01/1993
  • Publisher: AWWA

$12.00$24.00


The author offers guidelines for establishing a distribution system maintenance program: 1) use main information systems; 2) optimize water quality in the treatment plant; 3) use a fixed flow direction pattern in the network as long as possible; 4) research the useful life expectancy of pipe materials and predict replacement dates; 5) every 10-12 years, renovate the system to maintain the transport function; 6) accept reactive maintenance on service connections and valves; and 7) formulate replacement criteria based on costs and interruption time. This primer offers detailed discussion of each point.

Related Products

AWWA ACE61602

AWWA ACE61602

A Method for the In-Situ Regeneration of Granular Filter Media..

$12.00 $24.00

AWWA ACE62965

AWWA ACE62965

Partnerships Are the Basis of Conservation Success..

$12.00 $24.00

AWWA ACE90008

AWWA ACE90008

GAC Adsorption in the Presence of Background Organic Matter: Pretreatment Approaches and Attenuatio..

$12.00 $24.00

AWWA JOINT53602

AWWA JOINT53602

Implementing an Organizational Performance Management System: EBMUD's Experience..

$12.00 $24.00