• AWWA IMTECH51435
Provide PDF Format

Learn More

AWWA IMTECH51435

  • Designing, Developing & Implementing an Organizational Performance Management System
  • Conference Proceeding by American Water Works Association, 03/01/2000
  • Publisher: AWWA

$12.00$24.00


A recent study of almost 50 water and wastewater utility managers from various sized utilities revealed that, despite a common strategic goal of operational excellence, the managers scored lower in areas related to task and task accomplishment than would be expected in a well led organization. The study indicates the need to emphasize the accomplishment of results. A goal and metrics driven Organizational Performance Management System (OPMS) can help to focus and organization on results. This paper discusses the four key characteristics of a successful OPMS. Includes 3 references, figures.

Related Products

AWWA ACE54295

AWWA ACE54295

A Team Approach--Laboratory Reengineering and Procurement of a LIMS..

$12.00 $24.00

AWWA MTC69758

AWWA MTC69758

Novel Performance Modeling of Forward Osmosis / Reverse Osmosis Integrated System..

$12.00 $24.00

AWWA CONS50892

AWWA CONS50892

The Economics of Commercial-Grade Horizontal-Axis Clothes Washers: Detailed Metering and Real-World ..

$12.00 $24.00

AWWA MTC93042

AWWA MTC93042

High Water Recovery with Electrodialysis Reversal..

$12.00 $24.00