• AWWA IMTECH54019
Provide PDF Format

Learn More

AWWA IMTECH54019

  • Twelve O'Clock Low
  • Conference Proceeding by American Water Works Association, 06/01/2001
  • Publisher: AWWA

$12.00$24.00


Most large systems integration projects are a lot like bombing missions: you havean objective to achieve but you should expect to take a lot of hits/flack alongthe way. This paper is a case study of the Montgomery, Alabama, Water and SewerBoard's experience in constructing and commissioning its water and wastewatersupervisory control and data acquisition (SCADA) systems. By-and-large thisproject was very successful but project teams should realize that flack attacksare inevitable and are to be expected. Specific areas of emphasis in this paperinclude construction and startup, as well as technical and nontechnical issues.Construction issues include various and sundry radio problems encountered andsolved. Startup issues involve achieving smooth transition between normalautomatic and backup modes of the wastewater lift stations. Technical issuesinclude a summary of polling schemes and communication statistics. Nontechnicalissues include a discussion of the bid history and absorbing changes of players,including individuals and even a subcontractor. Includes figures.

Related Products

AWWA JAW23801

AWWA JAW23801

Journal AWWA - Controlling Swampy Odors in Drinking Water ..

$15.00 $30.00

AWWA DSS60350

AWWA DSS60350

Design, Construction and Operation of Denver's New Recycled Water System..

$12.00 $24.00

AWWA JAW64847

AWWA JAW64847

Journal AWWA - Process-Train Profiles of NOM through a Drinking Water Treatment Plant..

$15.00 $30.00

AWWA JAW59515

AWWA JAW59515

Journal AWWA - Expanded Summary: Protecting Watersheds from Cryptosporidium in Manure: A Literature ..

$15.00 $30.00