• AWWA IMTECH59635
Provide PDF Format

Learn More

AWWA IMTECH59635

  • Plant Automation Using Fieldbus Technology in the Water Industry
  • Conference Proceeding by American Water Works Association, 04/18/2004
  • Publisher: AWWA

$12.00$24.00


This paper focuses on the challenges faced by the design team in their approach to designing a state-of-the-art water treatment plant. CDM, Inc.'s design team, which included plant operations and plant engineering staff, designed around two fieldbuses for its Groundwater Replenishment System (GWRS) design project for the Orange County Water District in Southern California. Foundation Fieldbus was selected for the majority of analog process control, and DeviceNet was selected for motor control and miscellaneous discrete signal applications. The paper details the GWRS project followed by an overview of fieldbus technology and a summary of how the fieldbuses were incorporated into the design. Includes table, figures.

Related Products

AWWA WQTC65946

AWWA WQTC65946

Nitrosamine, Nitrile and Nitramine Formation Relevant to Nitrification Control..

$12.00 $24.00

AWWA ACE61607

AWWA ACE61607

The Benefits of Using Large Diameter Fiberglass Casing in ASR Wells..

$12.00 $24.00

AWWA JAW72811

AWWA JAW72811

Journal AWWA - Lead Removal from Tap Water Using POU Devices..

$15.00 $30.00

AWWA ACE71031

AWWA ACE71031

Knowledge Management and Retention..

$12.00 $24.00