Provide PDF Format
AWWA IMTECH62897
- Proof-of-Concept: The Result
- Conference Proceeding by American Water Works Association, 03/01/2006
- Publisher: AWWA
$12.00$24.00
This slide presentation outlines the City of Henderson's laboratory information management system (LIMS) procurement. Objectives of the presentation include: provide overview of proof-of-conceptmethodology;describe the benefits andchallenges of using the proof-of-conceptmethodology; and,discuss the result of our proof-of-conceptproject. Topics outlined include: LIMS Project History; Original Project Phases; Proof of Concept; Adjusted Project Phases; Proof-of-ConceptInstrument Interfacing; Proof-of-ConceptSystem Parameters; Proof-of-Concept Phases; Proof-of-Concept Benefits and Considerations; and, Post POC - Benefits and Considerations.
Related Products
AWWA C300-97
Reinforced Concrete Pressure Pipe, Steel-Cylinder Type, for Water and Other Liquids..
$23.00 $45.00
AWWA MTC64614
RO Process Design Optimization Based on Stochastic Cost Estimation Model Coupled with Process Perfor..
$12.00 $24.00
AWWA WQTC52875
Low Pressure UV Inactivation of Cryptosporidium parvum and Giardia lamblia Based on Infectivity Assa..
$12.00 $24.00