• AWWA INF52164
Provide PDF Format

Learn More

AWWA INF52164

  • Assessing the Prioritization of Capital Improvements for Twenty-Six Open-Cut Reservoirs
  • Conference Proceeding by American Water Works Association, 01/01/2000
  • Publisher: AWWA

$12.00$24.00


The East Bay Municipal Utility District of Oakland, California, owns and operates26 open-cut reservoirs within its water distribution system. The oldest wasconstructed in 1884 and the newest in 1992. The purpose of this paper is toexplain the development of the methodology for the improvement of the District'sopen-cut water distribution reservoirs. The proposed rehabilitation work requiredfor each reservoir with corresponding cost estimates is prioritized based onimproving water quality, worker safety, and water distribution reliability.District operations, maintenance, and the various regulatory agencies'requirements are also considered. Includes tables.

Related Products

AWWA JAW37687

AWWA JAW37687

Journal AWWA - Technical Note: Constructing Algae Counting Chambers..

$15.00 $30.00

AWWA ACE99367

AWWA ACE99367

Pneumatic Pipe Bursting: Challenges and Successes in the '90s..

$12.00 $24.00

AWWA WQTC71626

AWWA WQTC71626

Contribution of Galvanic Corrosion to Lead (Pb) in Water after Partial Lead Service Line Replacement..

$12.00 $24.00

AWWA JAW46165

AWWA JAW46165

Journal AWWA - Evaluating Criteria for Enhanced Coagulation Compliance..

$15.00 $30.00