  • Resolving Design and Construction Issues of Large Diameter Pipelines
  • Conference Proceeding by American Water Works Association, 06/01/2001
  • Publisher: AWWA

$12.00$24.00


The San Diego County Water Authority completed construction of Pipeline 5Extension, Phase II, commonly known as the Rancho Pe¿asquitos Pipeline during1998. This paper describes a number of solutions to challenges encountered duringdesign and construction, which may be beneficial to other major infrastructureprojects. This project addressed challenges in providing operational flexibilityto handle present, future, and emergency conditions, right-of-way restrictions,steep terrain, urban construction, protection of existing streams, multiple pipejoint designs, and special consideration for public coordination. Includes figures.

Related Products

AWWA ACE56347

AWWA ACE56347

Distribution/Water Quality Control for Small Systems..

$12.00 $24.00

AWWA CONS50891

AWWA CONS50891

High-Efficiency Washing Machine Demonstration, Bern, Kansas..

$12.00 $24.00

AWWA WQTC62432

AWWA WQTC62432

Dual Use of the Iodide/Iodate Actinometer to Monitor Ultraviolet Irradiation and to Provide a Residu..

$12.00 $24.00

AWWA ACE69073

AWWA ACE69073

Lesson from Condition Assessment Tools and Transporters toward a Better Future for Pipeline Asset Ma..

$12.00 $24.00