• AWWA JAW10834
Provide PDF Format

Learn More

AWWA JAW10834

  • Journal AWWA - Negotiating Construction Claims
  • Journal Article by American Water Works Association, 02/01/1984
  • Publisher: AWWA

$15.00$30.00


Today's uncertain construction costs coupled with overly competitive bidding make cost overruns and claims by contractors in the heavy construction industry almost inevitable. Negotiating such claims, although time- consuming, can be an equitable means of settlement. Each party's position must be documented from the beginning of the project before claims exist, and positions must be clearly defined when negotiations take place. All parties must be willing to compromise. The roles of the parties in the disagreement are defined, the construction environment is described, and tactics that permit settlement by negotiation are discussed.

Related Products

AWWA DSS63735

AWWA DSS63735

Energy Consumption of Advanced Water and Wastewater Treatment Technologies..

$12.00 $24.00

AWWA JAW28412

AWWA JAW28412

Journal AWWA - Flocculation in Turbulent Flow: Measurement and Modeling of Particle Size Distributio..

$15.00 $30.00

AWWA C224-11

AWWA C224-11

Nylon-11 Based Polyamide Coating System for the Interior and Exterior of Steel Water Pipe, Connectio..

$41.00 $81.00

AWWA SOURCES55640

AWWA SOURCES55640

Conserve Water, Conserve Energy: The Energy Saving Benefits of Water Conservation..

$12.00 $24.00