• AWWA JAW10837
Provide PDF Format

Learn More

AWWA JAW10837

  • Journal AWWA - Key Elements of Construction Specifications
  • Journal Article by American Water Works Association, 02/01/1984
  • Publisher: AWWA

$15.00$30.00


Three types of serious disputes that commonly arise during the construction of water treatment facilities are related to schedule delays, site conditions, and performance of the contract. Typical provisions of construction specifications pertaining to such disputes are examined. Finally, four techniques for resolving disputes are discussed from the project owner's point of view, namely negotiation, mediation, arbitration, and litigation. Includes 6 references, tables.

Related Products

AWWA SRC57778

AWWA SRC57778

Source Water Assessment and Protection of Crystal Lake, Wakefield, Massachusetts..

$12.00 $24.00

AWWA ACE68805

AWWA ACE68805

Advanced Recycled Water Treatment: An Effective Long Term Strategy for Two Agencies..

$12.00 $24.00

AWWA QTC97158

AWWA QTC97158

Effective Quality Assurance Principles for the Drinking Water Environmental Laboratory..

$12.00 $24.00

AWWA WSC61383

AWWA WSC61383

The Role of System Design and Operation on Consumer Exposure from a Deliberate Contamination Event..

$12.00 $24.00