• AWWA JAW37682
Provide PDF Format

Learn More

AWWA JAW37682

  • Journal AWWA - PCBs in Sealants in Water Distribution Reservoirs
  • Journal Article by American Water Works Association, 04/01/1995
  • Publisher: AWWA

$15.00$30.00


In routine response to taste and odor complaints, the East Bay Municipal Utility District (EBMUD) drained and cleaned a 65-mil-gal reinforced-concrete reservoir used to store treated water. The polysulfide caulking material used to seal joints between floor panels was in poor condition and required replacement. The deteriorated caulking was analyzed to determine whether it would require special handling before disposal. Analyses indicated that the caulking contained about 20 percent polychlorinated biphenyls (PCBs). Tests confirmed that the caulk did not pose a threat to drinking water quality; however, it was inappropriately released to a nearby drainage course, thus contaminating soils. EBMUD is completing a $2-million remediation and restoration of the drainage course and is investigating PCBs in sealants in all its distribution system reservoirs. Unless disposed of properly, the PCB-laden sealants pose a tremendous liability for EBMUD and for other water utilities with similar facilities. Includes 6 references, figure.

Related Products

AWWA ACE95164

AWWA ACE95164

How to Model the Biggest Privatized Water Supply System in the World - Case Study of Buenos Aires..

$12.00 $24.00

AWWA ACE93087

AWWA ACE93087

IWR-MAIN Version 6.0 Computerized Planning Tool..

$12.00 $24.00

AWWA CSC91086

AWWA CSC91086

Planning for Total Information and Control Requirements..

$12.00 $24.00

AWWA ACE92130

AWWA ACE92130

Control and Speciation of Disinfection By-Products by Biological Treatment..

$12.00 $24.00