• AWWA JAW39551
Provide PDF Format

Learn More

AWWA JAW39551

  • Journal AWWA - Pilot-Plant Studies: From Planning to Project Report
  • Journal Article by American Water Works Association, 03/01/1996
  • Publisher: AWWA

$15.00$30.00


Pilot-plant studies are often considered appropriate or necessary for effective planning, design, and operation of water treatment facilities. By carefully planning pilot-plant investigations before they are undertaken and by diligently conducting the study, water utility staff and engineers can maximize the return on the resources invested in pilot-plant programs. This article contains ideas and concepts on pilot-plant testing that have been developed through two decades of work with pilot plants. Includes 7 references, figures.

Related Products

AWWA 51568

AWWA 51568

Strategies for Treatment of Spent Filter Backwash Water Prior to its Recycle..

$12.00 $24.00

AWWA CSC94027

AWWA CSC94027

Customer Information System Project: Commercial Software Solution - Obtaining Control Over the Vend..

$12.00 $24.00

AWWA CSC91019

AWWA CSC91019

High Technology Procurement..

$12.00 $24.00

AWWA QTC98387

AWWA QTC98387

Environmental Technology Verification Test Plans for Removal of Microorganisms and Particulate Matt..

$12.00 $24.00