• AWWA JAW46187
Provide PDF Format

Learn More

AWWA JAW46187

  • Journal AWWA - Communication Strategies for Pipeline Construction
  • Journal Article by American Water Works Association, 07/01/1997
  • Publisher: AWWA

$15.00$30.00


The San Diego County Water Authority has nearly completed a 3.4-mi (5.5-km), 72-in.-(1,830-mm-) diameter potable water pipeline and associated facilities in northwest San Diego County, California. The north county distribution pipeline project includes the pipeline, three flow control and metering facilities, a 1-mil-gal (0.0004 x 10 6-m3) prestressed concrete regulating structure, and a chlorine contact tank. The pipeline parallels and crosses two 24-in.-(610-mm-) diameter potable lines that serve 85 percent of the daily water supply to Oceanside, California. Construction began in March 1995 and concluded late in 1996. Includes figures.

Related Products

AWWA WQTC71503

AWWA WQTC71503

Iron and Manganese Catalytic Removal for Drinking Water Production..

$12.00 $24.00

AWWA SRC57795

AWWA SRC57795

Chemical Indicators of Human Activity and Associated Impact to Vulnerable Surface Water Supplies in ..

$12.00 $24.00

AWWA WQTC64133

AWWA WQTC64133

The Microbial Composition of Drinking Water Biofilms in Relation to Disinfection Regime Changes..

$12.00 $24.00

AWWA JAW34955

AWWA JAW34955

Journal AWWA - Predicting and Verifying TOC Removal by PAC in Pilot-Scale UF Systems..

$15.00 $30.00