• AWWA JAW48192
Provide PDF Format

Learn More

AWWA JAW48192

  • Journal AWWA - Implementing a Large-Meter Replacement Program
  • Journal Article by American Water Works Association, 08/01/1998
  • Publisher: AWWA

$15.00$30.00


This article discusses how a comprehensive large-meter replacement program can help utilities avoid revenue losses caused by malfunctioning meters and increase reliability of service to customers. The following five phase program is outlined and discussed: phase 1 - create a large-meter database; phase 2 - perform field inspection of meter, and conduct customer site survey; phase 3 - prepare hydraulic calculations, and design meter setting; phase 4 - perform cost-benefit analysis and construction; and, phase 5 - update meter database and track meter performance. Includes 2 references, tables.

Related Products

AWWA ACE59939

AWWA ACE59939

Effect of Humic Acid on Bromate Reduction by Zero Valent Iron..

$12.00 $24.00

AWWA C300-97

AWWA C300-97

Reinforced Concrete Pressure Pipe, Steel-Cylinder Type, for Water and Other Liquids..

$23.00 $45.00

AWWA MTC64614

AWWA MTC64614

RO Process Design Optimization Based on Stochastic Cost Estimation Model Coupled with Process Perfor..

$12.00 $24.00

AWWA WQTC52875

AWWA WQTC52875

Low Pressure UV Inactivation of Cryptosporidium parvum and Giardia lamblia Based on Infectivity Assa..

$12.00 $24.00