• AWWA JAW48192
Provide PDF Format

Learn More

AWWA JAW48192

  • Journal AWWA - Implementing a Large-Meter Replacement Program
  • Journal Article by American Water Works Association, 08/01/1998
  • Publisher: AWWA

$15.00$30.00


This article discusses how a comprehensive large-meter replacement program can help utilities avoid revenue losses caused by malfunctioning meters and increase reliability of service to customers. The following five phase program is outlined and discussed: phase 1 - create a large-meter database; phase 2 - perform field inspection of meter, and conduct customer site survey; phase 3 - prepare hydraulic calculations, and design meter setting; phase 4 - perform cost-benefit analysis and construction; and, phase 5 - update meter database and track meter performance. Includes 2 references, tables.

Related Products

AWWA DSS60330

AWWA DSS60330

Developing Nashville's Master Water Plan..

$12.00 $24.00

AWWA CONS51061

AWWA CONS51061

Rates, Water Budgets and Outdoor Water Use..

$12.00 $24.00

AWWA ACE99537

AWWA ACE99537

Leveraging Optimization Success Throughout a Utility..

$12.00 $24.00

AWWA ACE95175

AWWA ACE95175

FIELD LOK Gaskets, An Effective Ductile Iron Pressure Pipe Joint Restraining System..

$12.00 $24.00