• AWWA JAW48192
Provide PDF Format

Learn More

AWWA JAW48192

  • Journal AWWA - Implementing a Large-Meter Replacement Program
  • Journal Article by American Water Works Association, 08/01/1998
  • Publisher: AWWA

$15.00$30.00


This article discusses how a comprehensive large-meter replacement program can help utilities avoid revenue losses caused by malfunctioning meters and increase reliability of service to customers. The following five phase program is outlined and discussed: phase 1 - create a large-meter database; phase 2 - perform field inspection of meter, and conduct customer site survey; phase 3 - prepare hydraulic calculations, and design meter setting; phase 4 - perform cost-benefit analysis and construction; and, phase 5 - update meter database and track meter performance. Includes 2 references, tables.

Related Products

AWWA ACE68687

AWWA ACE68687

Current State of Membrane Fouling Understanding and Future Research Needs..

$12.00 $24.00

AWWA WQTC62421

AWWA WQTC62421

Removal of THM Precursors vs. Formed THMs: A GAC Pilot Study..

$12.00 $24.00

AWWA REUSE52105

AWWA REUSE52105

Water Reclamation in South Africa..

$12.00 $24.00

AWWA ACE94066

AWWA ACE94066

Small Systems - Uniting to Become Stronger..

$12.00 $24.00